Editing Great Shaft
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 14: | Line 14: | ||
== History == | == History == | ||
=== Construction === | === Construction === | ||
− | According to the information on | + | According to the information on Aitrus' map, building the Great Shaft "required the four greatest rock-working machines in all of the D'ni Empire and a few months to complete", and "was designed by Surveyors Guild Master [[Garten]]". Unlike the small expedition team of surveyors who had managed the tunnel digging project on their own, the Great Shaft required a much larger team, with members from multiple guilds, from the [[Guild of Miners]] to the [[Guild of Caterers]]. Construction ran for several months, beginning in 9336 DE and ending in 9337. |
=== Sealing === | === Sealing === |